Project Reports

Project Reports

Wamly provides two main reporting categories: Organisation Reports (for cross-portal oversight) and Project Reports (for specific vacancy data).

There are two types of reports available on Projects:
  1. Full Project Report: A comprehensive export containing all candidate data and system information for that project.
  2. Psychometric Merit List Only: This specialized report ranks candidates by their overall "job fit" score (highest to lowest). It is only available if psychometrics are active and includes detailed sections on profiled behavioural competencies, cognitive abilities, and learning agility.

Access and Visibility

  1. Permissions: Only System Managers and Administrators have the authority to view or generate reports.
  2. Departmental Silos: Administrators can only see and generate reports for projects and users within their own allocated departments.
  3. Rater Restrictions: When a rater opens a project, they cannot access reports; they are restricted to the rater screen for candidate evaluation.

Accessing and Generating Reports

Full Project Report

  1. To access a Projects reports click on the open the related project and click on “Reports”.


  1. You are able to download Previously generated reports or Generate New Reports.


  1. Upon Generating a new report you are able to select if you want to be notified on when the report is ready as well as include the report in the notification email.


  1. This report will have full and comprehensive data detail of your Project including:
    1. Candidate Details.
    2. Candidate Status.
    3. Application Overview.
    4. Application Form Data.
    5. Application Raters and their overall comments.
    6. Average Ratings given.
    7. Question answer ratings and comments.
    8. If enabled on the Project, Background Check results will be available.
    9. If enabled on the Project, Psychometric Assessment results will be available.

Psychometric Merit List Only Report

  1. To access a Projects reports click on the open the related project and click on “Reports”.


  1. You are able to download Previously generated reports or Generate New Reports.


  1. Upon Generating a new report you are able to select if you want to be notified on when the report is ready as well as include the report in the notification email.


  1. This report will have full and comprehensive data detail of your Psychometric Results including:
    1. Overall Scores.
    2. Social Desirability Scores.
    3. Selected Competency Scores.
    4. Other Competency Scores.
    5. Motivator Scores.
    6. Learning Agility Scores.
    7. Cognitive Sub-Scale Scores.


    • Related Articles

    • Managing System Reports

      You are able to view reports in a live dashboard format or download for ease of use and data manipulation as required. There are four levels of reporting in Wamly Users Projects Candidates Email Logs Users A list of users detailing their Name, User ...
    • Managing a Project

      Project Overview While viewing a project you will be able to see comprehensive details about it: The status of the project is visible. (Active, Inactive, Draft). There are action buttons at the top to: “Remind Raters” - This is to remind the raters ...
    • Lesson 16: Reports

    • Creating & Managing Projects

      This guide provides the necessary steps to create, configure and manage your Projects. Correctly configuring a Project is vital to ensure candidates receive the right information, raters have the correct access and permissions as well as ensuring the ...
    • Dashboard

      The Dashboard is where users are always directed to when accessing their Wamly Portal. This view is based on user permissions and gives a comprehensive analytical view of the following in two sections: Analytics Section Raters: A rater will only see ...