Managing System Reports

Managing System Reports

You are able to view reports in a live dashboard format or download for ease of use and data manipulation as required.

There are four levels of reporting in Wamly
  1. Users
  2. Projects
  3. Candidates
  4. Email Logs

Users

A list of users detailing their Name, User Role, Email Address, Contact Number and User Status.


Projects

A list detailing all projects as well as Project related detail and settings.


Candidates

A list detailing all candidates that have applied to respective projects with project and application stages.


Email Logs

A log listing all emails sent to Candidates from the Wamly system.
You are able to select if you want to be notified when an email fails to deliver.


Generating Reports

You are able to generate comprehensive and detailed reports on each of the given sections. 

InfoAlert
Email Logs: While a report for email logs exists, the export functionality is currently disabled. This is due to the extreme volume of automated communications (invitations, reminders, etc.) which makes generating large Excel files technically unfeasible.

Select the section you would like a report generated on, click “Generate Report” and the selected report will be emailed to the logged in Wamly User’s email address.

Project Reports

Info
For more information regarding Project Reports refer to this article.

    • Related Articles

    • Managing Users

      Users are a critical part of the Wamly system as this will control access and permissions to your Organisation. Users should not be confused with Company Employees applying for roles within the Company. Once a User gets added to the Organisation they ...
    • Managing Background Checks

      In Wamly, Background Checks are an optional, integrated feature that allows organisations to conduct various verifications—such as criminal history, credit, and qualifications—directly within the platform. Candidate data and consent is collected up ...
    • Creating & Managing Projects

      This guide provides the necessary steps to create, configure and manage your Projects. Correctly configuring a Project is vital to ensure candidates receive the right information, raters have the correct access and permissions as well as ensuring the ...
    • Project Reports

      Wamly provides two main reporting categories: Organisation Reports (for cross-portal oversight) and Project Reports (for specific vacancy data). There are two types of reports available on Projects: Full Project Report: A comprehensive export ...
    • Managing Integrations

      Integrations in Wamly are designed to consolidate fragmented hiring tools into a single, automated ecosystem, enabling organisations to manage the entire candidate journey—from attraction to background verification—within one platform. Accessing the ...